Site logo
Sticky header logo
Mobile logo
  • Who we are
    • Our company
    • News
    • Sustainability
    • Careers
  • What we do
    • Services
    • Divisions
      • HVAC
      • Fire protection
      • Control systems
  • Projects
  • Contact
  • EN
    • ES
Prevrefrigeration installation of beer tanksEstrella Galicia: refrigeration installation of beer tanks07 February 2017NextHow do low temperature radiators work?22 February 2017
  • News
  • Works

Arce Clima has been chosen for the design of the new magnet test laboratory in the CERN

14 February 2017

Thus, it has been conveniently considered to move the CERN’s magnet test laboratory to a different place. The new laboratory is going to be on new site with brand new installations.

CERN stands for European Centre of Nuclear Research. It is a magical place which after the Higgs boson breakthrough, the elemental particle which could explain the origin of matter, has leaded towards an experiment to make subatomic particles crash nearly reaching the speed of light. These efforts to rememorize the conditions which brought the Big Bang to the Earth are still intended to be brought back today.

Why does the Cern need a magnet test laboratory?

The particles collider which is generally used for these experiments is composed by over 9,600 “supermagnets” – 100,000 times more powerful than the gravity force of the Earth – which throw the protons towards a circular course at an unimaginable speed.

The stator magnets are made of 36 strands which are twisted together, 15mm thick, each of them composed by between 6,000 and 9,000 individual filaments and a diameter of 7 micrometers.

The great length of the particles collider requires over 7,600 km of cable which is equivalent to 270,000 km of threads sufficient to go around the Earth six times.

The ArceClima´s role in the new CERN’s magnet test laboratory.

The new building which will host the magnet laboratory is being completely projected in 3D by different departments at CERN. However, Arce Clima has been honored by being chosen to collaborate directly with these calculation departments and with the definite 3D design of practically all the installations of this building:

  1. Climate control
  2. Sanitary water
  3. Fire protection
  4. Compressed air
  5. Demineralized water

Everything is ready for correct refrigeration of the electromagnets without altering its magnetic field as well as refrigerate its power supplies. This also includes the electrical power installation and performance monitoring of all of them.

The design process of this type of installation requires very demanding processes and operations. However, working along with the personnel of CERN with continuous exchange of information will enhance better performance in the projects.

Did you know about CERN and the importance of the work they carry out? Feel free to comment and stay tuned!

[rscontentoffer]

Related posts

Flagship Store with Platinum LEED Certification in Valencia
23 July 2020in 0 Comments 0 Likes

Flagship Store with Platinum LEED Certification in Valencia

The study and development of Scada Systems at Arce Clima
10 July 2020in 0 Comments 0 Likes

The study and development of Scada Systems at Arce Clima

Melia White House, London
20 March 2020in 0 Comments 0 Likes

Melia White House, London

Works Impact of BIM Technology on our fire protection division
21 February 2020in Works 0 Comments 0 Likes

Impact of BIM Technology on our fire protection division

Actúa Youth New talents program
14 February 2020in Actúa Youth 0 Comments 0 Likes

New talents program

Hotel sector in Arce Clima
3 February 2020in 0 Comments 0 Likes

Hotel sector in Arce Clima

News Special buildings: Bullitt Center
27 December 2016in News 0 Comments 0 Likes

Special buildings: Bullitt Center

Regulation and control solutions in climatization systems
23 December 2016in 0 Comments 0 Likes

Regulation and control solutions in climatization systems

Advisory Heat pumps
21 December 2016in Advisory 0 Comments 0 Likes

Heat pumps in climatization

Advisory heating installation
12 December 2016in Advisory 0 Comments 0 Likes

3 key elements of a heating installation.

Ace Clima Blog
23 November 2016in 0 Comments 0 Likes

Arce Clima´s blog starts today!

Leave a Reply

Click here to cancel reply.

Your email address will not be published. Required fields are marked *

Search

Phone
+34 981 976 215
Address
Parque Empresarial Alvedro, I-17 · Culleredo · A Coruña · 15180 | Spain
Email
info@arceclima.com

Recent Post

Signs your HVAC system needs repairs
16 July 2025 in Advisory
Arce Clima has joined the Diversity Charter
26 May 2025 in Actúa social
How does air conditioning impact your team’s productivity?
28 April 2025 in Actúa ECO
Arce Clima reaffirms its commitment to excellence and sustainability through the renewal of its ISO 9001, ISO 14001, and ISO 45001 certifications.
18 March 2025 in CSR
Installing Daikin chillers for HVAC system installation in the textile industry
3 February 2025 in
ARCE CLIMA HAS BEEN AWARDED THE ARDÁN INDICATOR FOR BEING A HIGH PRODUCTIVITY COMPANY
9 December 2024 in CSR

Follow us

Política de privacidad | Aviso legal | Política de cookies
© 2025 Arce Clima
¿En qué podemos ayudarte?
1
Equipo Arce Clima
¡Hola! Somos el equipo de atención al cliente de Arce Clima. ¿En qué podemos ayudarte?
Chat
We use the cookie information to improve our knowledge of the use of our web site and to enable us to be able to ascertain whether the web site is operating at an optimal level.