Site logo
Sticky header logo
Mobile logo
  • Who we are
    • Our company
    • News
    • Sustainability
    • Careers
  • What we do
    • Services
    • Divisions
      • HVAC
      • Fire protection
      • Control systems
  • Projects
  • Contact
  • EN
    • ES
PrevHeat pumpsHeat pumps in climatization21 December 2016NextSpecial buildings: Bullitt Center27 December 2016
  • Works

Regulation and control solutions in climatization systems

23 December 2016

Installation elements and other services are located on the 5th floor plus water and electricity, where the climatization system of the whole building is controlled. For this reason, designing and installing the whole climatization system of the store was one of our main duties, providing regulation and control solutions which verify the proper functioning of the installation and electric consumption.

All designed to be able to meet the rigorous LEED standards which require this kind of installations.  LEED stands for Leadership in Energy and Environmental Design with the “American independent touch” in green building constructions.

Key points to take into consideration in this project:

  • Client requirements regarding convenience and ease to use the equipment installed by the store staff. It was also fundamental to consider each of the elements that are part of this installation in order for them to be remotely selected and in real time.
  • Restrictions to consider since it is a LEED certification installation besides the fact that energetic efficiency remains pivotal within the project.
  • Installation functionality

climatization_Zara

What regulation and control solutions were chosen for this project?

In this case, it was necessary to opt for the required development of regulation and control solutions in order to monitor the air conditions and temperature of each floor.

The climatization system of the installation entirely falls into a centralized panel of control which was designed specifically to gather in one system different installation needs. This system is in charge of:

  1. Air conditions (air quality, temperature, humidity) of different floors of the building. Four floors for commercial use and two for warehouse and staff zones with 4375 square meters.
  2. Climate control machines working properly, in this case the chosen ones were the VRH Hitachi with more than fifty three interior units distributed all along the building.
  1. Register of equipment electric consumption in order to verify that an efficient energy consumption use was being undertaken so that store climatization remained at good levels.

climatization_zara

Success of the system lies in the adequate programming of the panel of control which allows for guaranteeing ideal conditions of the building´s interior, keeping low energy consumptions which, in fact, remains as a very important factor considering the size of the building.

What do you think about this kind of systems in massive constructions? Please feel free to leave a comment and do not forget to subscribe to our blog so you do not miss out!

[rscontentoffer]

Related posts

Flagship Store with Platinum LEED Certification in Valencia
23 July 2020in 0 Comments 0 Likes

Flagship Store with Platinum LEED Certification in Valencia

News The study and development of Scada Systems at Arce Clima
10 July 2020in News 0 Comments 0 Likes

The study and development of Scada Systems at Arce Clima

News Melia White House, London
20 March 2020in News 0 Comments 0 Likes

Melia White House, London

Impact of BIM Technology on our fire protection division
21 February 2020in 0 Comments 0 Likes

Impact of BIM Technology on our fire protection division

Actúa Youth New talents program
14 February 2020in Actúa Youth 0 Comments 0 Likes

New talents program

Hotel sector in Arce Clima
3 February 2020in 0 Comments 0 Likes

Hotel sector in Arce Clima

Special buildings: Bullitt Center
27 December 2016in 0 Comments 0 Likes

Special buildings: Bullitt Center

Heat pumps
21 December 2016in 0 Comments 0 Likes

Heat pumps in climatization

Advisory heating installation
12 December 2016in Advisory 0 Comments 0 Likes

3 key elements of a heating installation.

Ace Clima Blog
23 November 2016in 0 Comments 0 Likes

Arce Clima´s blog starts today!

Leave a Reply

Click here to cancel reply.

Your email address will not be published. Required fields are marked *

Search

Phone
+34 981 976 215
Address
Parque Empresarial Alvedro, I-17 · Culleredo · A Coruña · 15180 | Spain
Email
info@arceclima.com

Recent Post

Signs your HVAC system needs repairs
16 July 2025 in Advisory
Arce Clima has joined the Diversity Charter
26 May 2025 in Actúa social
How does air conditioning impact your team’s productivity?
28 April 2025 in Actúa ECO
Arce Clima reaffirms its commitment to excellence and sustainability through the renewal of its ISO 9001, ISO 14001, and ISO 45001 certifications.
18 March 2025 in CSR
Installing Daikin chillers for HVAC system installation in the textile industry
3 February 2025 in Works
ARCE CLIMA HAS BEEN AWARDED THE ARDÁN INDICATOR FOR BEING A HIGH PRODUCTIVITY COMPANY
9 December 2024 in CSR

Follow us

Política de privacidad | Aviso legal | Política de cookies
© 2025 Arce Clima
  • Phone Number for calling
  • Email Address
  • LinkedIn
  • Instagram
¿En qué podemos ayudarte?
1
Equipo Arce Clima
¡Hola! Somos el equipo de atención al cliente de Arce Clima. ¿En qué podemos ayudarte?
Chat
We use the cookie information to improve our knowledge of the use of our web site and to enable us to be able to ascertain whether the web site is operating at an optimal level.