HVAC INSTALLATION IN A HISTORICAL BUILDING IN BILBAO

Date
September 2018
Location
Bilbao, Spain
Category
Control Systems, HVAC

Arce Clima HVAC installed and continues to maintain the mechanical services for the historical building in Bilbao. The project comprised one of the most emblematic buildings in Bilbao due to its particularities and physiognomy.

One of the major features of this premises was the tight schedule to comply with the requirements and protection elements demanded by the World Heritage Site. This was an extremely challenging project as the building had to remain fully functional at all times during the works.

 

ACCLIMATISING A PECULIAR BUILDING PROTECTED BY THE WORLD HERITAGE SITE

Many of our projects require specific peculiarities. However, the venue to be replaced was one of the most symbolic buildings in the centre of Bilbao.

Fotos de edificio histórico en Bilbao climatizado por Arce Clima

It was built in 1907 and its structure has centenarian elements protected by the World Heritage Site. Optimal planning and extremely rigorous care were fundamental to tackle this project.

Proyecto de climatización, terminado, de local comercial en edificio histórico de bilbao

With over 5000 square metres, this building has the longest ground floor among all the stores our client has worldwide: 95 metres of showroom. Three floors with customised design and a personalised image, all the existing elements were kept to maintain the building´s architectural essence, including the eight main pillars, stained glass and ceiling.

Sistema de conductos para local comercial
Trabajadores de Arce realizando tareas de climatización

Scope of works:

  • VRV with heat recovery system
  • Modification and upgrades to cooling tower systems
  • Mechanical Electrical upgrade
  • Ventilation system upgrade
  • Demolition
  • Commissioning
  • Service and Maintenance
Proyecto de climatización en proceso de edificio histórico en Bilbao
Climatización de local comercial en proceso

The project was completed to the highest standard without interruption at any time to existing building conditions and was completed on time and within budget.

Sistema digital de configuración climatización en local comercial
Sistema de mantenimiento digitalizado para local comercial

Would you like to learn more about this project? Please let us know in the comment section below!