Site logo
Sticky header logo
Mobile logo
  • Who we are
    • Our company
    • News
    • Sustainability
    • Careers
  • What we do
    • Services
    • Divisions
      • HVAC
      • Fire protection
      • Control systems
  • Projects
  • Contact
  • EN
    • ES
PrevComprehensive maintenance solutions of installations26 May 2017NextII Once ArceClima CupII Once Arce Clima Cup16 June 2017
  • Works

Climate control installation at Carlota Hotel in Fuerteventura.

7 June 2017

Fuerteventura, an island declared Biosphere Reserve by the Unesco. It has the largest steppe and desert habitats in the Canarian archipelago with the greatest biological diversity of marine environment.

Fuerteventura is also a model in terms of sustainable tourism so greats efforts are made to allow traditional activities coexist with the mass tourism which one can find in the island all year round.

The climate control installation is precisely linked to tourism. It is the Elba Carlota Beach & Convention Resort Hotel installed nearly nine years ago, being one of the first hotels done by Arce Clima.

The resort has over 400 hundred rooms, a casino, an entertainment room and a Convention Centre with capacity for more than 800 attendees. It hosts different events for firms, congresses…etc which shows the dimension and the magnitude of the project that was going to be tackled.

How should the premises of such dimension be acclimatized correctly?

Keeping these premises at a comfortable temperature was a big challenge not only because it was one of the first hotels Arce Clima had to deal with but also due to the dimension and complexity of the works carried out.

The project was performed at a very high level due to two main cooling production centrals of 388KW. One of them with a recovery system which is fed by cold water between 7-12 degrees Celsius. Also, these cooling production centrals supply primary air treatment units and communal areas within the complex.

Moreover, these two centrals generate the necessary cool air which the individual fan coils of each room work with.
The whole installation has a monitored system which allows for control and supervision of centralized data.

After an intense year carrying out works, the hotel was inaugurated in 2008 and nine years later, continues to perform at a very high level.

If you would like to learn more about our works in hotels, please leave a comment below!

[rscontenoffer]

Related posts

Flagship Store with Platinum LEED Certification in Valencia
23 July 2020in 0 Comments 0 Likes

Flagship Store with Platinum LEED Certification in Valencia

The study and development of Scada Systems at Arce Clima
10 July 2020in 0 Comments 0 Likes

The study and development of Scada Systems at Arce Clima

News Melia White House, London
20 March 2020in News 0 Comments 0 Likes

Melia White House, London

Impact of BIM Technology on our fire protection division
21 February 2020in 0 Comments 0 Likes

Impact of BIM Technology on our fire protection division

Actúa Youth New talents program
14 February 2020in Actúa Youth 0 Comments 0 Likes

New talents program

Hotel sector in Arce Clima
3 February 2020in 0 Comments 0 Likes

Hotel sector in Arce Clima

News Special buildings: Bullitt Center
27 December 2016in News 0 Comments 0 Likes

Special buildings: Bullitt Center

Regulation and control solutions in climatization systems
23 December 2016in 0 Comments 0 Likes

Regulation and control solutions in climatization systems

Advisory Heat pumps
21 December 2016in Advisory 0 Comments 0 Likes

Heat pumps in climatization

Advisory heating installation
12 December 2016in Advisory 0 Comments 0 Likes

3 key elements of a heating installation.

Ace Clima Blog
23 November 2016in 0 Comments 0 Likes

Arce Clima´s blog starts today!

Leave a Reply

Click here to cancel reply.

Your email address will not be published. Required fields are marked *

Search

Phone
+34 981 976 215
Address
Parque Empresarial Alvedro, I-17 · Culleredo · A Coruña · 15180 | Spain
Email
info@arceclima.com

Recent Post

Signs your HVAC system needs repairs
16 July 2025 in Advisory
Arce Clima has joined the Diversity Charter
26 May 2025 in Actúa social
How does air conditioning impact your team’s productivity?
28 April 2025 in Actúa ECO
Arce Clima reaffirms its commitment to excellence and sustainability through the renewal of its ISO 9001, ISO 14001, and ISO 45001 certifications.
18 March 2025 in CSR
Installing Daikin chillers for HVAC system installation in the textile industry
3 February 2025 in
ARCE CLIMA HAS BEEN AWARDED THE ARDÁN INDICATOR FOR BEING A HIGH PRODUCTIVITY COMPANY
9 December 2024 in CSR

Follow us

Política de privacidad | Aviso legal | Política de cookies
© 2025 Arce Clima
  • Phone Number for calling
  • Email Address
  • LinkedIn
  • Instagram
¿En qué podemos ayudarte?
1
Equipo Arce Clima
¡Hola! Somos el equipo de atención al cliente de Arce Clima. ¿En qué podemos ayudarte?
Chat
We use the cookie information to improve our knowledge of the use of our web site and to enable us to be able to ascertain whether the web site is operating at an optimal level.